Week 4 Aims: - Finishing the second Idea successfully. Week 4 Issues: - Soldering the LEDs together. In this final week, we managed to finish our second Idea successfully. Here are some of the steps that we have done to finish the process: Note: in week 3, we stated that the code was our primary concern. The problem was not in the coding, but rather in the circuit. It turns out that an oscilloscope must be connected to the clock generator for the Lights to respond to music. The oscilloscope probe was used to examine the clock generator's pins 0 and 1. The circuit was operating well and serving its intended function. A reason might be that the output of the Clock generator is defective due to soldering and the oscilloscope probes are fixing this issue. Masterclock was configured for usage with the nin-default 25 MHz frequency. With output 0 frequency of 165 KHz and output 1 frequency of 104 KHz. Here are the steps that were done this we...
Comments
Post a Comment